A Pioneer realtor inside DHOLERA SIR

Call: +91 94088 08800, +91 261 2474888 | Awards | Updates | Testimonials | FAQs | Downloads


Home / Dholera SIR

Dholera SIR

Dholera Special Investment Region (DSIR) is a Greenfield Industrial City planned and
located approximately 100 km South West of Ahmedabad.

pixel_08

Activation Zone

Have a look at our strategic partner details, you can connect with them for detailed information on investing with us.

ActivitionZone

Overview of Activation Zone

OverviewofActivationZone

96 Thousasnds

Resident Population

76 Thousasnds

Total Jobs in Dholera

AreaChart

Activation Area current project status

Have a look at our strategic partner details, you can connect with them for detailed
information on investing with us.

Projects Under progress
1. Road and Underground Services including storm water 1734 Crores
2. Administrative & Business Center for Dholera(ABCD) 73 Crores
3. Prtable Water: WTP 90 Crores
4. Sewage: STP 1734 Crores
5. Industrial Effluent: CETP 73 Crores
6. Raw Water: 90 Crores
7. Flood Control: 1734 Crores
8. Solid Water 73 Crores
9. Power: 90 Crores
img_1

Roads & Services in Activation Area

  • 72KM OF ROADS

  • Shaded Pedestrian

  • Integrated Signal System

  • Dedicated Cycle Track

  • Security & Surveillance

  • Traffic Management

  • Real Time Information

72KM

Total Road Length

L & T

Contractor

1734 Cr.

Construction Cost

Sewage Treatment Plant & Common Efflument Treatment Plant (CETP)

Detailed design of STP is under process by the contractor of construction package of CETP to be awarded in January 2017

  • 72KM OF ROADS

  • Shaded Pedestrian

  • Integrated Signal System

  • 72KM OF ROADS

  • Shaded Pedestrian

  • Integrated Signal System

10 MLD

Total STP Capacity

L & T

Contractor

53.9 Cr.

Construction Cost

20 MLD

Total CETP Capacity

TBD

Contractor

145 Cr.

Construction Cost

img_1
img_1

Water Treatment Plant

  • 72KM OF ROADS

  • Shaded Pedestrian

  • Integrated Signal System

  • 72KM OF ROADS

  • Shaded Pedestrian

  • Integrated Signal System

10 MLD

Total STP Capacity

L & T

Contractor

53.9 Cr.

Construction Cost

Images of
Activation Zone


Have a look at current progress done so far..