Adhiya River Bunding Phase-2

Phase-II Flood Protection works of Adhiya River between SH20 and SH06 are to be constructed under this project. Contractor : M/s Kalthia Engineering & Construction Ltd Contract Value (INR Crores) : 21.25 Status : Ongoing

Interior Works of SPV Building

Interior Works of Special Purpose Vehicle (SPV) building at ABCD Complex in DSIR Contractor : New Concept Contract Value (INR Crores) : 15.58 Status : Ongoing

ICT MSI Project

Design, Supply, Install, Test, Integrate, Commissioning, Operation & Maintenance of ICT Components in Cluster A1 of Activation Area at Dholera. Contractor : M/s D. R. Agarwal Infra Pvt Ltd Contract Value (INR Crores) : 68.99 Status : Ongoing

Earth filling in Selected Plots of Activation Area

Filling of Soil in Plot-A (70 Ha) and Plot-B (92 Ha) with average soil filling depth of 2.0m. The Scope of work pertain to clearing and grubbing of the project site of Plot A & B, Removal of unsuitable material from the project site and soil filling in the project site. Scope of work also […]

Balance Works of WTP (WTP – 50 MLD)

The Contractor scope includes review of designs already done and updation (if required), carry out all balance designs, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 2 months, 5 year O&M of 50 MLD Water Treatment Plant , Clear Water Reservoir (16.7 ML) , Clear Water Pumping Station (150 MLD), Potable Water Transmission Main (121.5 […]

Sewage Treatment Plant (STP – 10 MLD)

The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months & 5 year O&M of 6 Intermediate Sewage Pumping Stations , 1 Terminal Pumping station , 10 MLD Sewage Treatment Plant , 7.5 ML Master Balancing Reservoir and 70 MLD Pumping Station. Contractor : M/s Larsen & Toubro Ltd Contract […]

Common Effluent Treatment Plant (CETP – 20 MLD)

The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months and 5 year O&M of 14 Intermediate Effluent Pumping stations , 1 Terminal Pumping station , 20 MLD Common Effluent Treatment Plant , RO reject disposal pipeline (12 MLD) from the RO reject tank to the outfall at Sukhbhadar creek, […]

Service Area Buildings (with Porta Cabins)

Design, Procurement and Construction of 17 nos. of Service Area (With Porta Cabin), Operation and Maintenance of the project in conformity with the specifications & standards. Contractor : M/s Bridge & Roof Co. India Ltd Contract Value (INR Crores) : 32.82 Status : Ongoing

Canal Front Development Zone – 3

Construction of Canal Front Development including Land Filling, Civil, MEP and Landscape (Zone 03) in Dholera Special Investment Region, Dholera Contractor : M/s P.R.Patel & Company Contract Value (INR Crores) : 14.99 Status : Ongoing

Canal Front Development Zone -2

Construction of Canal Front Development including Land Filling, Civil, MEP and Landscape (Zone 02) in Dholera Special Investment Region, Dholera Contractor : M/s P.R.Patel & Company Contract Value (INR Crores) : 26.43 Status : Ongoing